RFQ Preparation Checklist
- Required angular tolerance (e.g., ±2°)
- Acceptable field deviation (ppm)
- Inspection report requirements (CMM, Magnetic)
Inspection methodologies for magnetization vector alignment, field mapping, and repeatable Halbach assembly performance.

| Program Metric | Typical Range | Procurement Value |
|---|---|---|
| Angular Alignment | Confirmed by DFM review | The fundamental mathematical requirement for the Halbach effect to function without severe harmonic distortion. |



Tight angular targets depend on geometry, grade, tooling, and measurement method. We confirm achievable limits after DFM review, sample validation, and inspection-plan approval.
Inquiry Email